§ 355.

PERMIT APPLICATIONS

a.

Building permit applications for a change in use or alteration of an existing building, to be collected by Central Permit Bureau; provided, however, that the fees charged for Planning Department approval over-the-counter for the replacement of windows, roofs, siding, and doors shall be reduced to ½ the fee set forth below. The Planning Department initial fee amount shall not exceed 50% of the construction cost, notwithstanding the foregoing. Applications for permit revisions are excluded from this limitation.



Estimated Construction Cost Initial Fee
$0.00 to $9,999.00 $326.00
$10,000.00 to $49,999.00 $334.00 plus 3.414% of cost over $10,000.00
$50,000.00 to $99,999.00 $1,725.00 plus 2.281% of cost over $50,000.00 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$100,000.00 to $499,999.00 $2,890.00 plus 2.497% of cost over $100,000.00 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$500,000.00 to $999,999.00 $13,068.00 plus 0.631% of cost over $500,000.00 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$1,000,000.00 to $4,999,999.00 $16,286.00 plus 0.248% of cost over $1,000,000.00 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$5,000,000.00 to $99,999,999.00 $26,392.00 plus .004% of cost over $5,000,000.00 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$100,000,000.00 or more $30,530 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee

1.

Application with Verified Violations of this Code: The Planning Department shall charge $1,153.00 as an inspection fee for monitoring code violation abatements.

2.

Back-Check Fee for Permit Revisions: $208.00 for the initial fee, plus time and materials as set forth in Section 350(c), to be collected at time of permit issuance.

3.

Shadow Impact Fee for New Construction or Alteration Exceeding 40 Feet in Height (Section 295): Additional $477.00 plus time and materials as set forth in Section 350(c).

4.

Public Notification Fee for Projects Requiring Public Notice Pursuant to Section 311: $49.00, plus $3.26 per envelope (subject to increase based on envelope and postage costs). The City’s reprographics department will print and mail public notices.

5.

Public Notification Fee for Projects Requiring Public Notice Pursuant to Section 312: $49.00, plus $1.13 per envelope (subject to increase based on envelope and postage costs). The City’s reprographics department will print and mail public notices.

6.

For projects with a construction cost of $100,000,000.00 or more, the applicant shall be charged the permit fee for a project with a $100,000,000.00 construction cost.

7.

Permits for solar panels and over-the-counter permits for solar equipment installation shall be $140.00 per permit.

b.

Building Permit Applications for a New Building. The Planning Department initial fee amount is not to exceed 50% of the construction cost; notwithstanding the foregoing, applications for permit revisions are excluded from this limitation.



Estimated Construction Cost Initial Fee
$0 to $99,999 $1,887.00, plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$100,000.00 to $499,999.00 $1,888.00 plus 2.446% of cost over $100,000.00 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$500,000.00 to $999,999.00 $12,068.00 plus 0.797% of cost over $500,000.00 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$1,000,000 to $4,999,999.00 $16,130 plus 0.306% of cost over $1,000,000.00 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$5,000,000.00 to $99,999,999.00 $28,630.00 plus 0.005% of cost of $5,000,000 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee
$100,000,000.00 or more $33,804.00 plus $89.00 Discretionary Review Surcharge and $291.00 Categorical Exemption Stamp Fee

1.

Applications with Verified Violations of this Code: $1,153 as an inspection fee for monitoring Code violation abatements.

c.

Demolition Applications, to be collected by Central Permit Bureau: $1,471.00.

d.

Fire, Police, Entertainment Commission, State Alcohol & Beverages Control and Health Department Permit Applications Referral Review: $124.00 initial fee collected by the other departments in conjunction with current fee collections, plus time and materials as set forth in Section 350(c).

e.

Sign Permit Applications, to be collected by Central Permit Bureau: $130.00.

AMENDMENT HISTORY

History

(Added by Ord. 153-93, App. 5/25/93; amended by Ord. 212-94, App. 6/2/94; Ord. 180-95, App. 6/2/95; Ord. 358-95, App. 11/15/95; Ord. 308-96, App. 7/25/96; Ord. 168-98, App. 5/21/98; Ord. 154-04, File No. 040819, App. 7/8/2004; Ord. 230-04, File No. 040955, App. 9/23/2004; Ord. 175-05, File No. 050917, App. 7/29/2005; Ord. 201-06, File No. 060699, App. 7/21/2006; Ord. 99-07, File No. 061535, App. 5/4/2007; Ord. 156-08, File No. 080737, App. 7/30/2008; Ord. 186-09, File No. 090698, App. 8/6/2009; Ord. 54-10, File No. 091113, App. 3/19/2010; Ord. 212-10, File No. 100703, App. 8/4/2010; Ord. 156-11, File No. 110707, App. 8/1/2011, Eff. 8/31/2011; Ord. 56-13 , File No. 130062, App. 3/28/2013, Eff. 4/27/2013)

Divisions (a) and (b) amended; fees increased throughout section; Ord. 156-11, Eff. 8/31/2011. Division (a) amended; Ord. 56-13 , Eff. 4/27/2013.